The preferred option is based on an array of variables, not solely on one variable. When analyzing the various options one must consider the four R’s (Right Location, Right facility, Right program and Right Size), as outlined in the Initial Staff Report (Report 1).
The preferred option, proposed by Administration considers a balanced approach to delivering the best solution for the community and the Board given the overall objectives.